> Source: [sk1000301](https://support.checkpoint.com/results/sk/sk1000301)

# sk1000301 - Cluster members become unreachable with Soft Lockup logs

| Property | Value |
|----------|-------|
| Solution ID | sk1000301 |
| Date Created | 2026-10-21 |
| Last Modified | 2026-10-26 |
| Technical Level | Advanced |
| Products | Security Gateway, Check Point Firewall |
| Versions | R82.10, R82, R81.20, R81.10 (EOS), R82.20 |
| OS | Gaia |

## Symptoms

- * A VRRP Cluster member becomes unreachable, causing a service outage in the Cluster.
* Cluster members do not reply to ping, and the Gaia web portal is not reachable.
* Logging in via the serial console, you can see soft lockup error logs, for example:

      [routed:28829]filter1 kernel: NMI watchdog: BUG: soft lockup - CPU#1 stuck for 23s!
      filter1 kernel: Modules linked in: tcp_diag udp_diag inet_diag vrrp_lkmmod(POE) cppcap(OE) caswell_pmbus nct6775... 
      filter1 kernel: CPU: 1 PID: 28829 Comm: routed Kdump: loaded Tainted: P OE ------------ T 3.10.0-1160.15.2cpx86_64 #1

* System logs show a large backward clock change, for example, from a future date to `01 Jan 2009`.
* Secure Internal Communication (SIC) and Secure Sockets Layer (SSL) communication fail because certificates are evaluated as `not valid yet`.
* Cluster synchronization fails between VRRP cluster members.

## Cause

This issue can occur when the appliance experiences a significant backward system time change after a reboot.

<br />

In this scenario, the system clock changed from a future date to `01 Jan 2009` after Network Time Protocol (NTP) synchronization became active following a reboot of the Jumbo Hotfix Accumulator.  
Because the system time became earlier than the validity start time of Check Point certificates, certificates used for SIC, SSL, cluster synchronization, and management communication were evaluated as not yet valid.

<br />

As a result:

* SIC communication between the affected cluster member and the Security Management Server fail.
* SSL negotiation fails between the VRRP cluster members.
* Cluster synchronization on TCP port 263 fails.
* `cxld`, `cpd`and SIC-based services could not communicate correctly.
* SmartView could not receive correct status updates.
* Fullsync Critical Device events appeared repeatedly.

<br />

The large time rollback also affected `routed` and VRRP-related processing, resulting in instability that appeared as kernel soft-lockup events.  
The investigation also found a low CMOS battery voltage. A weak CMOS battery may prevent the appliance from preserving the hardware clock correctly across reboots, increasing the likelihood of incorrect system time after startup.  
No Check Point software defect requiring a code change was identified.

<br />

## Solution

This solution requires authentication. Please log in to view the full solution.

---

# Agent Instructions

This content is from the Check Point Support Center (https://support.checkpoint.com), the official knowledge base for Check Point cybersecurity products.

## Navigating This Knowledge Base

- **Complete index**: [llms.txt](https://support.checkpoint.com/llms.txt)
- **All SK articles**: [SecureKnowledge Sitemap](https://support.checkpoint.com/sitemaps/secureknowledge-sitemap-index.xml)
- **SK article URL pattern**: `https://support.checkpoint.com/results/sk/{skId}`
- **Markdown responses**: AI bot User-Agents automatically receive `text/markdown` content
